Meta



Refer to Accounting Test Question No.1

 

(a) Computation of the activity based costs and profits for each contract.

Step 1: Compute cost per unit of cost driver

= Cost pool / cost driver volume

Activity

Cost pool (a)

Cost driver volume/yr (b)

Cost/unit of cost driver (a)/(b)

Moulding

$150,000

2,000

$75/moulding hour

Inspection

$75,000

150

$500/batch

Production Management

$125,000

20

$6,250/contract

Step 2: Compute the cost drivers consumed by each contract

Cost driver

Customer AAA

Customer BBB

Batches

1,000 unit/100 =10

2,000unts/50=40

Moulding hours

10batches x 5=50

40batchesx7.5=300

Contracts

1

1

Step 3: Finally, compute the Costs And Profit For Each Contract

Under Activity Based Costing Methodology

Costs And Profits For Each Contract

Contract AAA

Contract BBB

Selling price

$27,000

$100,000

Materials

1,000 x $15

$15,000

2,000 x $20

$40,000

Moulding

50 hours x $75

$3,750

300 hour x$75

$22,500

Inspection

10 batches x $500

$5,000

40 batches x $500

$20,000

Management

$6,250

$6,250

Total cost

$30,000

$88,750

Profit/(Loss)

($3,000)

$11,250

(b) Computation of profit based on absorption costing using moulding hour

First compute the overhead absorption rate

=Total annual overheads/annual moulding hour

=($150,000+$125,000)/2,000

=$175 per moulding hour.

Under Absorption Costing Methodology

Costs And Profits For Each Contract

Contract AAA

Contract BBB

Selling price

$27,000

$100,000

Materials

1,000 x $15

$15,000

2,000 x $20

$40,000

Overheads

50 hours x $175

$8,750

300 hour x$175

$52,500

Total cost

$23,750

$92,500

Profit/(Loss)

$3,250

$7,500

Notes:

  1. Based on activity based costing, Customer AAA’s contract would be unprofitable while Customer BBB’s contract is worth accepting. (Refer earlier article on ABC able to give a true cost)
  2. If we use the traditional costing accounting/method which is the absorption costing basis, the management will think that both contracts were profitable.
  3. Using activity based costing, the management should only accept only 1 contract which is Customer AAA’s contract.

If you found this post useful, keep updated with future posts by subscribing to FMAccounting (for free) through RSS or email.


2 Responses to “Answer To Accounting Test Question No. 1 On Activity Based Costing”  

  1. 1 Accounting Question No 1 On Activity-Based Costing | FMAccounting
  2. 2 Management Accounting Question ABC No2 On Activity Based Costing | FMAccounting


Leave a Reply


Recommended

Accounting Blogs/Sites